Client:
Rio Tinto
Sectors:
Field Services
Capabilities:
Maintenance
Shutdowns
Situation
Structures at the Dampier Port facilities were nearing end of life and required upgrading to ensure a safe working environment.
Solution
- An audit was carried out to identify which structural members required replacement and/or refurbishment.
- Aerison were engaged to supply and install various structural and flooring members to ensure operations can continue.
- Supply of materials, installation and quality assurance activities were required for this live operational facility.
Outcome
- A series of upgrades to conveyor trusses, stairwells, walkways and structural members were carried out over a period of time both in shutdowns and during general operations.
- Through effective consultation and planning, operational downtime was limited allowing for works to be carried out with minimal impact.
- The project was delivered safely and incident free.